cn

The first public announcement of public participation in the environmental impact assessment of the second phase of the Su Ma Pa

2019.12.26
Views:6715
Share:

The first public announcement of public participation in the environmental impact assessment of the second phase of the sewage treatment plant in the northern part of the Ma'anshan Modern Industrial Park (High speed Rail New City) in Suzhou

1. Overview of the construction project
1.1 Proposed Project Name
Suzhou Ma'anshan Modern Industrial Park (High Speed Rail New City) North Sewage Treatment Plant Phase II Project;


1.2 Site selection
Shuma Modern Industrial Park, north of Chujiang Avenue;


1.3 Construction Content
On the basis of the current treatment process and structures of the Phase I project, new (renovated) buildings and structures required for the Phase II project will be constructed, mainly including a comprehensive building, fine grid and cyclone sedimentation tank, hydrolysis acidification tank, shallow air flotation tank, emergency tank, combined C-AAO biochemical sedimentation tank, high-efficiency sedimentation tank, sludge concentration tank, denitrification filter tank, ozone generation room, ozone contact tank, deodorization system and its supporting new equipment and pipelines, electrical and instrumentation system renovation. The design scale of the second phase project is 45000 tons/day, which will be implemented in three stages. The implementation scale for each stage is 15000 tons per day.


1.4 Current Engineering and Environmental Protection Situation
The design scale of the first phase project is 15000 tons/day, and the actual construction scale is 7500 tons/day. The sewage treatment process is an improved C-A2O tank process; Waste gas: mainly generated by sewage treatment and sludge treatment, covering and sealing the pollution sources that can be covered, and strengthening the greening of the factory area; Wastewater: Adopting a rainwater and sewage separation system, rainwater is discharged into the river outside the factory through the rainwater pipe network, and sewage is treated to meet standards before being discharged into the new river; Noise: The use of low-noise equipment and measures such as shock absorption can make the factory boundary noise meet the standard; Solid waste: Sludge is sent to the Suzhou municipal landfill for sanitary landfill, while slag, settling sand, and household waste are promptly cleared and disposed of for sanitary landfill.


2. Name and contact information of the project construction unit


2.1 Project construction unit
Wancho Environmental Protection Co., Ltd;


2.2 Contact Information
Contact: Xiao Gong
Contact phone number: 13856188316
Address: Chujiang Avenue North, SuMa Modern Industrial Park, Ma'anshan Modern Industrial Park, Suzhou (High Speed Rail New City), North Sewage Treatment Plant


3. Name and contact information of the organization responsible for environmental impact assessment work
The environmental impact assessment of the proposed project will be undertaken by Anhui Tongji Environmental Protection Technology Co., Ltd. The contact information is as follows:

Contact: Xia Gong
Phone: 0557-3920476
E-Mail: 13955780600@163.com
Address: Room 1213, Building 5, Huanyu International, Suzhou City

4. Network connection for public opinion forms
URL: http://www.ahtjhb.cn/news_detail.aspx?id=475

5. Ways and channels for submitting public opinion forms
1. Send the completed public opinion survey form to email: 13955780600@163.com ;
2. Fill out the form and print it out by the public, and submit it to Mr. Xiao at the North Sewage Treatment Plant of Suzhou Ma'anshan Modern Industrial Park (High speed Rail New City) on Chujiang Avenue, Su Ma Modern Industrial Park, at 13856188316;

During the process of preparing the draft environmental impact assessment report for soliciting opinions, the public can provide comments related to the environmental impact assessment to the construction unit.




Wancho Environmental Protection Co., Ltd

December 26, 2019