Announcement on Inquiry for Installation Engineering of Rainwater and Sewage Drainage Open Channel Construction Project for Industrial Enterprises in Suma Industrial Park
The installation project of the rainwater and sewage discharge outlet open channel construction project for industrial enterprises in SuMa Park has met the bidding conditions. We are now inquiring about the project and welcome bidders who meet the conditions to participate in the bidding.
1、 Project Name and Content
1. Project Name: Installation Engineering of Rainwater and Sewage Drainage Open Channel Construction Project for Industrial Enterprises in Suma Industrial Park
2. Project location: Suzhou City, Anhui Province
3. Construction general contractor: Wancho Environmental Protection Co., Ltd
4. Project scale: According to the relevant regulations of the "Technical Requirements for Standardized Remediation of Pollutant Outlets (Trial)" and other documents, combined with the actual situation of the park, each of the 26 major water related enterprises in the park is required to set up one sewage discharge outlet and one rainwater discharge observation outlet.
(1) Open channel for sewage discharge outlet
Each enterprise's sewage discharge outlet must use open channels with water quantity detection for discharge. In the Su Ma Industrial Park, due to the large amount of production wastewater and high pollution factors, enterprises should set up an integrated pasteurization tank as a sewage channel before connecting to the park's sewage pipeline network. The specific size of the channel should be determined according to the corresponding sewage volume of the polluting enterprise; For enterprises with small water volume and low pollution factors, pipeline flow meters and sewage open channels (the length, width, and depth of the open channels are determined according to the site conditions) are used. In addition, the sewage channel is equipped with fiberglass cover plates, surrounded by stainless steel protective railings, and the inner wall of the channel is covered with light colored corrosion-resistant ceramic tiles.
(2) Rainwater drainage outlet
At the rear end of each rainwater outlet in the factory area, there should be a section of open channel before connecting to the municipal rainwater main network. The length, width, and depth of the open channel should be determined according to the site conditions; The rainwater channel is equipped with fiberglass cover plates, surrounded by stainless steel protective railings, and the inner wall of the channel is covered with light colored corrosion-resistant ceramic tiles.
(3) Auxiliary facilities
According to on-site requirements, a lighting system can be installed to add pedestrian walkways and non motorized vehicle lanes to sewage and rainwater channels. Pedestrian walkways can be constructed with a width of 1m and a length determined based on the actual site conditions.
(4) Topographic survey
Conduct topographic survey of the surrounding area according to the owner's requirements.
(5) Smart Platform
Harajuku Park Smart Platform System Update.
5. Scope of bidding: Installation project of rainwater and sewage discharge outlet open channel construction project for industrial enterprises in Suma Park. Please refer to the bidding bill of quantities for details.
6. Construction period: Until November 10, 2024.
2、 Qualification of Bidders
1. Qualification requirements:
Having the ability to independently assume civil liability, possessing a legal and valid business license, a third level or higher qualification for general contracting of municipal public works construction within the validity period, and a safety production license.
2. Credit requirements:
2.1 Not included in the list of seriously illegal and dishonest enterprises by the Administration for Industry and Commerce in the National Enterprise Credit Information Publicity System (www.gsxt. gov.cn);
2.2 Not included in the list of dishonest persons subject to enforcement by the Supreme People's Court on the "Credit China" website (www.creditchina. gov.cn);
2.3 There are no other circumstances that are prohibited by laws, regulations, or instructions to bidders.
3. This project does not accept consortium bidding
Note: Bidders who do not meet the qualification requirements mentioned above will not be eligible to participate in this project quotation.
3、 Collection of bidding documents
1. Collection time: 3:00 pm on October 28, 2024 to 3:00 pm on November 4, 2024.
2. Collection method: For those who intend to participate in the bidding, please send the authorization letter, copies of the legal representative and authorized person's identity certificates, the authorized person's social security certificate (not required for direct participation in the bidding by the legal person), performance certificate, qualification certificate, and scanned copy of the business license with official seal to the email Wancho-001@wchep.com Or submit the materials on site to receive the bidding documents. If registration is made through email, the email subject is "Registration Materials for Installation Engineering of Rainwater and Sewage Drainage Open Channel Construction Project of Industrial Enterprises in Suma Park".
4、 Precautions for bidding and bid opening:
1. The bidding documents of this project allow bidding units to be delivered by mail or express delivery. Mailing address: Wancho Environmental Protection Co., Ltd. (Room 911, 9th Floor, Science and Technology Innovation Building, Suma Park, Suzhou City, Anhui Province), recipient: Wang Qiang, contact information: 17730225905. After the express delivery is sent, please send a photo of the express delivery receipt by email to Wancho-001@wchep.com The email name should be company name+contact person name+phone number for timely receipt. Please consider the delivery time by yourself. The submission time of the bidding documents shall be based on the time of receipt. In addition to the outer packaging for mailing, the bidding documents still need to be sealed according to the requirements of the procurement documents. However, any package damage or storage issues that occur during the mailing process shall be borne by the bidder.
2. The legal representative or authorized representative of the bidder may attend the bid opening meeting via video conference (the video conference number will be sent to the registration email one hour in advance. If the bidder submits the materials for registration on site, they should provide valid contact information). If the legal representative or authorized representative of the bidder is not present at the bid opening meeting, the written signature confirmation and other related operational requirements at the bid opening site shall be cancelled. The bidder shall inform the procurement staff of their contact information for inquiries and other matters.
5、 Media for publishing announcements
The bidding announcement is released on the official website of Wancho Environmental Protection Co., Ltd.
6、 Contact Information
Bidder: Wancho Environmental Protection Co., Ltd
Address: Suma Industrial Park, Suzhou City, Anhui Province
Contact: Wang Qiang
Phone: 17730225905