
Tender Notice for the Procurement of Spiral Welded Pipe (Stainless Steel Pipe) and Pipe Fitting for the Expansion of Sewage Treatment Plant and Tail Water Purification Project (EPC+O) in the North of Suma Industrial Park (General Plan)
This bidding project includes the expansion of the sewage treatment plant in the northern part of the Su Ma Park and the procurement of spiral welded pipes (stainless steel pipes) and fittings for the tail water purification project (EPC+O) plant area (overall plan). The project has met the bidding conditions and is now open for bidding. Bidders who meet the conditions are welcome to participate in the bidding.
1、 Project Name and Content
1. Project Name: Expansion and Tail Water Purification Project (EPC+O) of Sewage Treatment Plant in the North of Suma Industrial Park Plant Area (General Plan) Spiral Welded Pipe (Stainless Steel Pipe) and Pipe Fitting Procurement
2. Project location: Suzhou City, Anhui Province
3. Construction general contractor: Anhui Xigoma Material Technology Co., Ltd
4. Project scale: The construction content of this project mainly includes three sub projects: the expansion project of the sewage treatment plant in the northern part of the Su Ma Park, the reclaimed water reuse project, and the enterprise special pipeline network project. (1) The expansion project of the sewage treatment plant in the northern part of Suma Park: the planned total scale is 60000 m ³/d, and the first phase of the project has a scale of 45000 m ³/d. (2) Reclaimed water reuse project: The total scale is 75000 m ³/d, of which the civil engineering is completed in one go according to 75000 m ³/d, and the equipment scale is 45000 m ³/d. The construction of the membrane workshop and water tank will be completed in one go with a capacity of 75000 tons, and the equipment will be installed at a capacity of 45000 m ³/d in the first phase. The concentrated water generated by the reclaimed water reuse project is treated after coagulation and sedimentation, mixed with the sewage from the expansion project, and discharged in compliance with standards. (3) Enterprise special pipeline network project: DN400~DN900 pressure pipeline of about 8km. It mainly includes the Suzhou Shanying drainage pressure special pipe (DN900, 2.5km) and the middle water pressure special pipe (DN900, 3.5km) supplied from the SuMa Park sewage plant to Suzhou Shanying; Taisheng sewage drainage pressure special pipe (DN6001500m), supplied to Taisheng Paper Industry water pressure special pipe (DN400500m).
5. Scope of Tender: Expansion of Sewage Treatment Plant and Tail Water Purification Project (EPC+O) in the northern part of Suma Industrial Park (overall plan), procurement of spiral welded pipes (stainless steel pipes) and fittings, as detailed in the drawings and tender bill of quantities.
6. Construction period: Supply in batches, and the supply time for a single batch is to deliver to the location designated by Party A within the time specified by Party A.
2、 Qualification of Bidders
1. Qualification requirements:
Having the ability to independently assume civil liability, possessing a legal and valid business license, the business scope of the business license must include the production and sale of pipes or plastic products, or related businesses.
2. Performance requirements:
Within the past three years, there has been a supply performance of spiral welded pipes (stainless steel pipes) with a contract amount of not less than 4 million yuan (scanned copies of the contract and related supporting materials (including but not limited to invoices or completion acceptance reports), and key information needs to be seen in the scanned copies)
3. Credit requirements:
3.1 Not included in the list of seriously illegal and dishonest enterprises by the Administration for Industry and Commerce in the National Enterprise Credit Information Publicity System (www.gsxt. gov.cn);
3.2 Not included in the list of dishonest persons subject to enforcement by the Supreme People's Court on the "Credit China" website (www.creditchina. gov.cn);
3.3 There are no other circumstances that are prohibited by laws, regulations, or instructions to bidders.
4. This project does not accept consortium bidding
Note: Bidders who do not meet the qualification requirements mentioned above will not be eligible to participate in this project quotation.
1. Collection time: 10:00 am on September 10, 2024 to 10:00 am on September 29, 2024.
2. Collection method: For those who intend to participate in the bidding, please send the authorization letter, copies of the legal representative and authorized person's identity certificates, the authorized person's social security certificate (not required for direct participation in the bidding by the legal person), performance certificate, and scanned copy of the business license to the email address wanghui3182011@163.com Or submit the materials on-site to receive the bidding documents. If registration is made through email, the email subject is "Registration Materials for the Procurement of Spiral Welded Pipes (Stainless Steel Pipes) and Pipe Fittings for the Expansion and Tailwater Purification Project (EPC+O) Plant Area (General Plan) of the North Sewage Treatment Plant in Suma Park".
4、 Precautions for bidding and bid opening:
1. The bidding documents of this project allow bidding units to be delivered by mail or express delivery. Mailing address: Anhui Xigoma Material Technology Co., Ltd. (Room 911, 9th Floor, Science and Technology Innovation Building, Suma Park, Suzhou City, Anhui Province), recipient: Wang Hui, contact information: 15215574485. After the express delivery is sent, please send a photo of the express delivery receipt by email to wanghui3182011@163.com The email name should be company name+contact person name+phone number for timely receipt. Please consider the delivery time by yourself. The submission time of the bidding documents shall be based on the time of receipt. In addition to the outer packaging for mailing, the bidding documents still need to be sealed according to the requirements of the procurement documents. However, any package damage or storage issues that occur during the mailing process shall be borne by the bidder.
2. The legal representative or authorized representative of the bidder may attend the bid opening meeting via video conference (the video conference number will be sent to the registration email one hour in advance. If the bidder submits the materials for registration on site, they should provide valid contact information). If the legal representative or authorized representative of the bidder is not present at the bid opening meeting, the written signature confirmation and other related operational requirements at the bid opening site shall be cancelled. The bidder shall inform the procurement staff of their contact information for inquiries and other matters.
5、 Media for publishing announcements
The bidding announcement is simultaneously released on the official website of Wancho Environmental Protection Co., Ltd. and the Anhui Provincial Tendering and Bidding Information Network.
6、 Contact Information
Bidder: Anhui Xigoma Material Technology Co., Ltd
Address: No.1 Chujiang Avenue North, Suma Park, Suzhou City, Anhui Province
Contact: Wang Hui
Phone: 15215574485