
Project location: Huaiyuan County Economic Development Zone, Bengbu City
Project Overview: The project team was established in 2022, with a factory area of approximately 66.48 acres. The project is planned to be put into operation in December 2023, with a designed daily processing capacity of 30000 tons. The sewage treatment adopts AAO biological denitrification process, and the sludge treatment adopts centrifugal concentration followed by plate and frame pressing. The treated effluent finally enters the lower section of the Beifei River through the No.1 ditch.