We are now conducting an open inquiry for the "SuMa Park Sewage Pipeline Network Dredging and Testing, Underwater Sealing Labor Services". Bidders who meet the conditions are welcome to participate in the bidding.
1、 Project Name and Content
1. Project Name: SuMa Park Sewage Pipeline Network Dredging and Testing, Underwater Blocking Project;
2. Project location: Su Ma Park;
3. Tendering unit: Wancho Environmental Protection Co., Ltd;
4. Project Overview: The Phase I sewage pipeline network, 3 # lift pump station, and beautiful rural sewage treatment station project of Suzhou Ma'anshan Modern Industrial Park, as well as the Phase II and Phase III sewage pipeline networks, are organized and implemented by the Suzhou Ma'anshan Modern Industrial Park Management Committee. With the approval of the Suzhou Municipal People's Government, they are operated by Wancho Environmental Protection Co., Ltd. The total length of the sewage pipeline network in the Su Ma Park is about 122 kilometers (with pipeline diameters ranging from 400mm to 1200mm), involving more than 34 roads, and is continuously increasing. The total length of the pipeline network that requires centralized dredging is about 90 kilometers (the total length of the 400mm diameter pipeline network is about 70 kilometers, the total length of the 600mm diameter pipeline network is about 15 kilometers, the total length of the 800mm diameter pipeline network is about 10 kilometers, and the total length of the 1200mm diameter pipeline network is about 5 kilometers). The planned dredging volume for 2024 is 30 kilometers. In view of the long and difficult operation and maintenance of the pipeline network, as well as the frequent emergency situations, our company plans to sign a framework agreement for the labor services of sewage pipeline network dredging and underwater sealing for the whole year of 2024, in order to cope with various emergency situations during the pipeline network operation and maintenance process. Therefore, it is advisable to conduct a public bidding for this matter to the society.
5. Scope of bidding: Sewage pipeline network dredging and testing, underwater sealing labor services in Suma Park;
6. Bidding category: Labor procurement;
7. Division of Sections (Package Types): Divided into 1 section, please refer to the inquiry document for details;
2、 Qualification of Bidders
1. Having a legal and valid business license, and providing special certificates for diving operations and confined space operations of relevant underwater operators within the validity period.
2. Performance requirement: Provide a performance contract with a pipeline network length of no less than 10 kilometers or a contract amount of no less than 500000 yuan, including pipeline network testing.
3. This project does not accept consortium bidding.
3、 Time and location for receiving bidding documents
1. Registration period: 8:30 am on January 30, 2024 to 2:00 pm on February 6, 2024
2. Collection location: The bidder's qualification documents will be sent via email to( wancho-001@wchep.com )After being reviewed and meeting the qualification requirements, the corresponding bidding documents can be distributed through this email or registered on-site to receive the bidding documents.
4、 Bid deadline, bid opening time and location
1. Bid deadline and bid opening time: Please refer to the bidding documents for details;
2. Bid opening location: Please refer to the bidding documents for details;
5、 Contact Information
Bidder: Wancho Environmental Protection Co., Ltd
Address: Su Ma Modern Industrial Park, Suzhou City, Anhui Province
Contact: Hao Tengfei
Phone: 18656821105 0557-2667007
7、 Other matters explanation
1. If you have any questions or concerns during the registration process, please contact the project contact person during working hours (Monday to Friday, 9:00-11:30 am, 1:30-5:00 pm).