

Recently, staff from the Water Resources Bureau of Suzhou City visited the sewage treatment plant in Suma Industrial Park and set up signs at the discharge outlet of the plant, which displayed detailed information such as the outlet name, number, location, latitude and longitude, regulatory unit, and telephone number. They also provided the outlet with an "ID card".
The discharge outlet into the river is the main channel for pollutants to enter the water body. By controlling the discharge outlet into the river, it is possible to effectively control the pollutants entering the river. The staff of the Municipal Water Resources Bureau responsible for registration stated that with this "ID card", once abnormal river discharge is discovered, it can be traced and traced back in a timely manner.
Since February 2016, our company has been responsible for the operation and supervision of the river discharge outlet of the Su Ma Park sewage treatment plant project, ensuring the quality of the effluent and achieving safe and standard discharge. It has received recognition and praise from the leaders of the Municipal Water Resources Bureau multiple times. In the future, our company will continue to do our job well and bravely become the environmental protector of a harmonious society.