Second Public Announcement of Environmental Impact Assessment for Phase II of North Sewage Treatment Plant in Ma'anshan Modern I

2020.04.13
Views:6764
Share:
Ⅰ、 Brief description of construction project situation

Project Name: Suzhou Ma'anshan Modern Industrial Park (High Speed Rail New City) North Sewage Treatment Plant Phase II Project;
Construction unit: Wancho Environmental Protection Co., Ltd;
Construction nature: expansion;
Project Overview: The second phase of the project was approved in November 2014 (Su Ma Jing Fa [2014] No. 104). Due to changes in the name of the construction unit, investment amount, construction progress, etc., in December 2019, Wancho Environmental Protection Co., Ltd. applied for a change in the project approval and obtained the approval for the second phase of the project after the change on December 16, 2019 (Su Ma Jing Fa [2019] No. 60). The total investment for the second phase of the project is 212.5289 million yuan. On the basis of the first phase, an additional 34.85 acres of land will be added, with a scale of 4.5 × 104m3/d. The construction will be divided into three stages, each with a scale of 1.5 × 104m3/d. At the same time, supporting pipeline construction will be carried out, and the designed effluent quality will comply with the Class A standard of the "Pollutant Discharge Standards for Urban Sewage Treatment Plants" (GB18918-2002). The tail water will be discharged into the Xinhe River. After completion, the total scale of the sewage treatment plant in the northern part of the Ma'anshan Modern Industrial Park (High speed Railway New City) in Suzhou will reach 6.0 × 104m3/d..
Construction location: Chujiang Avenue North, Suma Modern Industrial Park (geographic center coordinates longitude 117.278239, latitude 33.692302).

Ⅱ、 Possible environmental impacts during the production process of this project
(1) Waste gas: The main pollutants in this project's waste gas are the foul odors generated by various sections of the biochemical treatment system, including the inlet section, hydrolysis tank, anaerobic tank, sludge disposal section, etc.
(2) Noise: The project noise mainly comes from induced draft fans, various pumps, etc.
(3) Wastewater: The wastewater generated in this project mainly includes incoming wastewater and domestic sewage generated within the factory.
(4) Solid waste: The project will generate a certain amount of solid waste during the production process, mainly including grid slag, sand settling, sludge, waste engine oil, waste packaging bags, employee household waste, etc.

Ⅲ、 The countermeasures and measures taken in this project to prevent or mitigate adverse effects
1. Wastewater
The incoming wastewater and wastewater within the factory area are discharged into the sewage treatment system of this project. After being treated through hydrolysis acidification+C-A2/O+deep treatment process, the wastewater meets the Class A standard of the "Pollutant Discharge Standards for Urban Sewage Treatment Plants" (GB18918-2002), and the tail water is discharged into the Xinhe River.


2. Waste gas
The main pollutants in the waste gas of this project are the odors generated by various sections of the biochemical treatment system, including the inlet section, hydrolysis tank, anoxic anaerobic tank, sludge disposal section, etc. The second phase of the project plans to cover and collect them in the grid tank, hydrolysis tank, anoxic anaerobic tank, sludge concentration tank, and conditioning tank. The sludge dewatering room frame machine and sludge screw conveyor will be covered and collected to prevent odors from escaping. After collection, the odorous gases will enter the biological deodorization system and be centrally treated before being discharged at a height of 15 meters. There are two sets of deodorization devices in total; Organized ammonia and hydrogen sulfide shall comply with the odor pollutant emission standards in Table 2 of the "Odor Pollutant Emission Standards" (GH14554-93); The discharge of unorganized odorous gases shall comply with the second level standard of "Maximum allowable concentration of waste gas emissions at the boundary (edge of protective belt)" in Table 4 of the "Pollutant Discharge Standards for Urban Sewage Treatment Plants" (GB18918-2002).


3. Noise
Utilize the factory building for equipment sound insulation, take effective sound insulation, absorption, and vibration reduction measures for sound sources, and install sound insulation covers or mufflers for production equipment with strong sound power levels to ensure that the factory boundary noise meets the requirements of Class 3 standards in the "Industrial Enterprise Boundary Environmental Noise Emission Standard" (GB12348-2008).

4. Solid waste
The grid residue from the sewage treatment plant is dehydrated and sent to the sanitary landfill in Suzhou City; After dewatering, the sand is sent to the sanitary landfill in Suzhou City; The remaining sludge after treatment is sent to the sanitary landfill in Suzhou City; Household waste should be handed over to the local environmental sanitation department for disposal; Dispose of waste engine oil by qualified units; Comprehensive utilization of waste packaging bags.

5. Environmental risk
The project risk assessment level is a simple analysis, and the unit has formulated risk prevention measures, risk management measures, and risk emergency plans. The risk level of this project is acceptable.

Ⅳ、 Conclusion of Environmental Impact Assessment
The construction project complies with national and local industrial policies, land use requirements, and relevant planning requirements; The overall process of the project meets the requirements of national clean production. All pollution control measures are appropriate, and pollutants can be stably discharged in compliance with standards after effective treatment. The impact on the external environment is relatively small, and the regional functional category will not be reduced, and it can meet the requirements of total control; The level of environmental risk is acceptable; After the implementation of various pollution prevention and control measures proposed in this project, it has been demonstrated from an environmental perspective that the construction of this project is feasible.

Ⅴ、 The method and deadline for the public to access the simplified version of the environmental impact assessment report, as well as the method and deadline for the public to request supplementary information from the construction unit or its commissioned environmental impact assessment agency when deemed necessary;
The public is requested to contact the construction unit or environmental impact assessment unit within ten days from the date of this announcement to provide feedback and suggestions on this project.

Ⅵ、 Scope and main issues for soliciting public opinions
1. Scope of Public Participation Survey
The scope of public participation survey for construction projects includes industries, enterprises, etc. involved in the project construction, and the survey targets mainly residents, workers, farmers, etc. in the project area.

2. Main issues
Main matters for soliciting public opinions: opinions on the implementation and site selection of construction projects; The impact of the project on the local economy and social development after completion; The degree of acceptance of the adverse effects caused by the project; Suggestions on the environmental protection measures taken for the project; What suggestions do you have for project construction.

Ⅶ、 The specific form of soliciting public opinions;
The public can raise their concerns to the construction unit, evaluation unit, and Su Ma Park Branch of Suzhou Ecological Environment Bureau through telephone, letter, and other means.
Environmental Impact Assessment Unit: Anhui Tongji Environmental Protection Technology Co., Ltd;
Unit address: Room 1213, Building 5, Huanyu International Plaza, Suzhou City, Anhui Province;
Contact: Xia Gong
Phone: 0557-3920476
E-Mail: 13955780600@163.com ;
Construction unit: Wancho Environmental Protection Co., Ltd;
Contact: Director Xiao
Contact phone number: 13856188316.

Ⅷ、 The starting and ending time for public opinions.
The public is requested to contact the construction unit or environmental impact assessment unit within ten days from the date of this announcement to provide feedback and suggestions on this project.

Ⅸ、 Soliciting opinions and publicizing them
The draft for soliciting opinions on the environmental impact assessment has been prepared and publicly announced as follows:

1、 The public can access it through( http://www.ahtjhb.cn/news_detail.aspx?id=482 )Download the full text of the environmental impact assessment solicitation draft and( http://www.ahtjhb.cn/news_detail.aspx?id=482 )Download the public opinion form. You can check the paper report at the construction unit's address: North of Chujiang Avenue, Su Ma Modern Industrial Park, Ma On Shan Modern Industrial Park (High Speed Rail New City) North Sewage Treatment Plant, Su Zhou.
Ways and channels for submitting public opinion survey forms:
1. Send the completed public opinion survey form to email: 13955780600@163.com ;
2. Fill out the form and print it out by the public, and send it to Room 1213, Building 5, Huanyu International Plaza, Suzhou City, Anhui Province, China. Xia Gong 0557-3920476;

2、 Units and individuals who may be affected can provide opinions related to environmental impact and protection to the construction unit or environmental impact assessment unit.
3、 The public can provide opinions to the construction unit or environmental impact assessment unit through the following channels. Environmental Impact Assessment Unit: Contact Person: Xia Gong, Phone: 0557-3920476; Construction unit: Contact person: Director Xiao, contact phone number: 13856188316.  
4、 The public shall provide their opinions within 10 working days from the date of this announcement.



Wancho Environmental Protection Co., Ltd
April 13, 2020