Announcement of Inquiry for Electrical Control Engineering (EPC+O) of the North Sewage Area Recycling and Reuse Project (High Speed Rail New City) in Suma Industrial Park
The electrical control project (EPC+O) for the regeneration and recycling of sewage area in the northern part of the SuMa Park (High Speed Rail New City) has met the procurement conditions. We are now inquiring about the project and welcome bidders who meet the conditions to participate in the bidding.
1、 Project Name and Content
1. Project Name: Electric Control Engineering (EPC+O) for the Regeneration and Recycling of Sewage Area in the North of Suma Industrial Park (High Speed Rail New City)
2. Project location: Suma Industrial Park, Suzhou City
3. Construction general contractor: Wancho Environmental Protection Co., Ltd
4. Project scale: (1) Tailwater wetland project: treatment capacity of 45000m3/d, construction of artificial wetland of 149000m2, (2) Tailwater discharge project: construction of one tailwater discharge pump station with a capacity of 45000 m ³/d; Supporting DN800 drainage pressure pipeline with a length of 4500m. (3) Connecting the water systems of No. 2 Gou, Shengli Gou, No. 1 Gou, Xinhe, etc. in the Su Ma Park to meet the project requirements.
5. Scope of Tender: Electrical Control Engineering for the North Sewage Area Recycling and Reuse Project (EPC+O) in Suma Industrial Park (High Speed Rail New City), please refer to the tender bill of quantities for details.
6. Duration: 60 calendar days.
2、 Qualification of the bidder
1. Qualification requirements:
Capable of independently assuming civil liability, possessing a legal and valid business license, having a third level or higher qualification for general contracting of power engineering construction, and having a valid safety production license.
2. Credit requirements:
2.1 Not included in the list of seriously illegal and dishonest enterprises by the Administration for Industry and Commerce in the National Enterprise Credit Information Publicity System (www.gsxt. gov.cn);
2.2 Not included in the list of dishonest persons subject to enforcement by the Supreme People's Court on the "Credit China" website (www.creditchina. gov.cn);
2.3 There are no other circumstances that are prohibited by laws, regulations, or instructions to bidders.
3. This project does not accept consortium bidding
Note: Bidders who do not meet the qualification requirements mentioned above will not be eligible to participate in this project quotation.
3、 Collection of bidding documents
1. Collection time: 3:00 pm on July 28, 2025 to 3:00 pm on August 4, 2025.
2. Collection method: For those who intend to participate in the bidding, please send the authorization letter, copies of the legal representative and authorized person's identity certificates, the authorized person's social security certificate (not required for direct participation in the bidding by the legal person), qualification certificate, and scanned copy of the business license stamped with the official seal to the mailbox Wancho-001@wchep.com Or submit the materials on-site to receive the bidding documents. If registration is made through email, the email subject is "Registration Materials for EPC+O Electrical Control Engineering of the North Sewage Area Recycling Project (High speed Rail New City) in Suma Park".
4、 Precautions for bidding and bid opening:
1. The bidding documents of this project allow bidding units to be delivered by mail or express delivery. Mailing address: Wancho Environmental Protection Co., Ltd. (Room 911, 9th Floor, Science and Technology Innovation Building, Suma Park, Suzhou City, Anhui Province), recipient: Wang Qiang, contact information: 17730225905. After the express delivery is sent, please send a photo of the express delivery receipt by email to Wancho-001@wchep.com The email name should be company name+contact person name+phone number for timely receipt. Please consider the delivery time by yourself. The submission time of the bidding documents shall be based on the time of receipt. In addition to the outer packaging sent by mail, the bidding documents still need to be sealed according to the requirements of the procurement documents. However, any package damage or storage issues that occur during the mailing process shall be borne by the bidder.
2. The legal representative or authorized representative of the bidder may attend the bid opening meeting via video conference (the video conference number will be sent to the registration email one hour in advance, and if materials are submitted on-site for registration, the bidder shall provide valid contact information). If the legal representative or authorized representative of the bidder is not present at the bid opening meeting, the written signature confirmation and other related operational requirements at the bid opening site shall be cancelled. The bidder shall inform the procurement staff of their contact information for inquiries and other matters.
5、 Media for publishing announcements
The bidding announcement is released on the official website of Wancho Environmental Protection Co., Ltd.